Skip to content
SELECTED PROJECTS & REFERENCE

High-Rise Condo @ CBD

INITIALLY CONDITION System Origin- Korean 140 MCP Parking lots, no surface parking space. High failure rate up to 2-3 times a day, despite blocking 40% of parking spaces.

RESULT Lower the breakdown frequency, compile system problems & rectify. Unlock pallets and enhance stability. System operate normally with minimized breakdown times.

< Back

Want to Chat?
Feel free to Contact our Team.

If you have anything in mind just contact us.